Located at the Browns’ existing training facility, CrossCountry Mortgage Campus, this project added a new state-of-the-art performance center and weight room.
The first floor is dedicated to weight training with direct access to the indoor field house, while the second floor includes a player’s lounge, multiple walk-through rooms, and an additional cardio area overlooking the outdoor practice fields. The roof includes a 5,600 SF patio for staff use and a premium lounge area for fans attending training camp.
A simulator room features two 25-yard-wide screens with four overhead projectors stitching the image together, enabling the Browns to use the space for film study or performing walk-throughs.
The facility was required to be open by August 1, 2024 (for training camp), meaning over $8 million of work had to be put in place just over 5½ months. Achieving this fast-paced schedule is a testament to our dedication to our clients and our flexibility in staffing projects correctly to meet challenging deadlines.
In addition to IC’s CM services, Independence Excavating performed the sitework and demolition on the project.
Our team is ready to show you how being built different helps us build better for you.